Soaker Flashings for Gasfitting

Module Code:                      SF66dertyh

Credit Value:                       6 Plumbing or Gasfitting CPD Points

Level:                                     Registration Plumbing/Gasfitting

Unit Standard Details:        Part 21884, Part 21890

 

 

 

 

Aim:

To provide students with resources to be able to identify the need for, design, and install soaker flashings and ensure the integrity of the moisture barrier of buildings.

 

Content:

This module ‘Soaker Flashings’ includes information on meeting the requirements of acceptable solution E2 and requirements of the New Zealand Building Code.

 

People credited with this module are able to:

Demonstrate knowledge of New Zealand Building Code Clause E2 External Moisture and requirements for the installation of the different sized penetration flashing systems.

 

Learning Outcomes:

On successful completion of this module students will be able to identify hot water systems and the valving requirements for those installations to comply with the New Zealand Building Code.

 

Content:

Information covering aspects of flashing of different sized penetrations and complying with E2 including support requirements and the impact of wind zones on the design of a soaker flashing.

 

Teaching Learning Methods:

  • Completion by the student of a printed workbook (kept by the student for use as reference at later dates)
  • Visual Presentation to be viewed in conjunction with workbook along with tasks requiring the student reference relevant codes to help ensure the student has knowledge to comply.

 

Assessment Details:

Online Moodle based Assessment of which the result is automatically forwarded to the Plumbers, Gasfitters & Drainlayers Board.

 

Click Here to do the course